Thursday, February 19, 2009

Reconstruction Update

The following buildings have been insulated, sheet rocked, & textured the 3rd floor ceilings however have not been insulated. That is a different type of insulation and requires a separate crew to blow that in.

4151 Pointe West Dr.
4211 Pointe West Dr.
4221 Pointe West Dr.
4231 Pointe West Dr.

This group of buildings has had all of the sheet rock hung and is in the process of being textured and should be done by this weekend.

26421 Cat Tail Dr.
4121 Pointe west Dr.
4241 Pointe West Dr.


Cotton will have a finish crew on site next week to start the trim and paint of the textured units.


Side Note: Cotton is walking all of the units in all of the buildings to check the A/C closets.

On Monday Cotton will have an A/C company on site to start hooking all of the A/C's up that were removed during the remediation. This will allow us to climatize the units as we move into the warmer months to help prevent any further damage from occurring.